BIOROCK-L Installation in Reading

BIOROCK-L Installation in Reading

Location

Wokingham, Reading

Project

Horticultural Farm with resident on-site workers.

System

BIOROCK-L Gravity System with ST2-3000 Primary Tank & BIOROCK-L Treatment Unit with 160mm Aeration Chamber.

Background

The existing septic tank was overloaded and was discharged to the ground. With the addition of new staff, a new system was required. The client had previously installed an electric system on another part of the farm which had proven to be very expensive to install, run and maintain. He was attracted to BIOROCK due to ease of installation, no running costs, and little maintenance but also the fact that he could discharge the treated effluent to a nearby ditch/stream.

Installation

The existing pipework into and from the septic tank was used to connect to the BIOROCK System. Installation was carried out by the client's staff under the supervision of a BIOROCK Engineer and was completed in less than 2 days.

Do you want to get in contact with us?

Hello, I’m José Manuel Rodríguez , BIOROCK’s International Sales Director. Contact us now for a FREE project assessment

Where are you located?

Who are you?

Your contact data

Phone prefix is set automatically after selecting country

What is your interest?

If you choose other please specify in the remarks field

Some details of your project