Installation of a sewage plant for a new build 4 bedroom house in Galway


Project: Installation of a System for a new build 4 bedroom house.

 

Location: Galway, Ireland

 

Plant: BIOROCK-S Unit with an ST2-3000 Primary Tank. High level pumped outlet.

 

Description: The client required a low maintenance and silent system for a new 4 bedroom house. A BIOROCK-S Unit with an ST2-3000 Primary Tank was installed by the clients groundworks company under the guidance and direction of a BIOROCK Engineer. The treated water is pumped to a pressurised raised bed filter system. The pump is triggered when the water reaches a float switch in the pump chamber and switches off when discharge is completed. Typically the pump run time is less than 30 mins a day and this combined with the natural biological non-electric treatment process, it gives the client the low maintenance and silent system required in the original brief.

 


Project images